FOREX Press I. J. of Electrical & Electronics Research
Support Open Access

Research Article |

Interconnection Study in Utilizing of Solar Energy for 150 MW Photovoltaic Power Generation through 150 kV Transmission Line

Author(s): Levin Halim*

Publisher : FOREX Publication

Published : 30 October 2023

e-ISSN : 2347-470X

Page(s) : 956-965




Levin Halim*, Department of Electrical Engineering, Parahyangan Catholic University, Bandung, Indonesia; Email: halimlevin@unpar.ac.id

    [1] N. Mansouri, A. Lashab, D. Sera, J. M. Guerrero, and A. Cherif, “Large photovoltaic power plants integration: A review of challenges and solutions,” Energies, vol. 12, no. 19. MDPI AG, Oct. 08, 2019. doi: 10.3390/en12193798.
    [2] M. Raugei et al., “Energy Return on Energy Invested (ERoEI) for photovoltaic solar systems in regions of moderate insolation: A comprehensive response,” Energy Policy, vol. 102, pp. 377–384, Mar. 2017, doi: 10.1016/J.ENPOL.2016.12.042.
    [3] M. Shafiullah, S. D. Ahmed, and F. A. Al-Sulaiman, “Grid Integration Challenges and Solution Strategies for Solar PV Systems: A Review,” IEEE Access, vol. 10, pp. 52233–52257, 2022, doi: 10.1109/ACCESS.2022.3174555.
    [4] J. Windarta, E. W. Sinuraya, A. Z. Abidin, A. E. Setyawan, and Angghika, “Perancangan Pembangkit Listrik Tenaga Surya (Plts) Berbasis Homer Di Sma Negeri 6 Surakarta Sebagai Sekolah Hemat Energi Dan Ramah Lingkungan,” in Prosiding Seminar Nasional MIPA 2019, 2019, pp. 21–36.
    [5] F. Murdiya, A. Hamzah, A. Azhari Zakri, N. Nurhalim, F. Sutan, and S. Suwitno, “Pemanfaat Energi Matahari Untuk Pompa Air Dan Penerangan Dalam Program Pengabdian Kepada Masyarakat,” Jurnal Pengabdian UntukMu NegeRI, vol. 4, no. 2, pp. 192–198, Nov. 2020, doi: 10.37859/jpumri. v4i2.2109.
    [6] J. Batalla-Bejerano and E. Trujillo-Baute, “‘Impacts of Intermittent Renewable Generation on Electricity System Costs.’”
    [7] J. T. Kearns, “Effects of Intermittent Generation on the Economics and Operation of Prospective Baseload Power Plants,” Massachusetts Institute of Technology, 2017.
    [8] M. Abdur Rosyied, L. Multa Putranto, I. Fathin Azhar, E. Yudo Pramono, and P. Hutama Karya, “Determination of PV and Wind Power Plant Penetration into a Power System: a Case of Java-Bali System,” Journal FORTEI-JEERI, vol. 1, no. 1, pp. 29–40, 2020, doi: 10.46962/forteijeeri. v1i1.04.
    [9] M. A. M. Ramli, S. Twaha, and Z. Al-Hamouz, “Analyzing the potential and progress of distributed generation applications in Saudi Arabia: The case of solar and wind resources,” Renewable and Sustainable Energy Reviews, vol. 70. Elsevier Ltd, pp. 287–297, Apr. 01, 2017. doi: 10.1016/j.rser.2016.11.204.
    [10] D. Eltigani and S. Masri, “Challenges of integrating renewable energy sources to smart grids: A review,” Renewable and Sustainable Energy Reviews, vol. 52. Elsevier Ltd, pp. 770–780, Aug. 22, 2015. doi: 10.1016/j.rser.2015.07.140.
    [11] A. P. Aditama, “Studi Kelayakan Pemasangan PLTS 870 kW pada Sistem Kelistrikan Pertamina EP Ukui-Lirik,” Tugas Akhir, Insititut Teknologi Sepuluh Nopember, Surabaya, 2018.
    [12] E. by Yanfei Li and S. Kimura, “Study on Power Grid Interconnection and Electricity Trading in Northeast Asia,” 2033.
    [13] M. Hafidz and M. JP, “Perancangan Interkoneksi Pembangkit Listrik Tenaga Surya 1MWp On-Grid Pada Jaringan Distribusi Cileungsi,” Jurnal Ilmiah SUTET, vol. 9, no. 2, pp. 112–124, Dec. 2019, doi: 10.33322/sutet.v9i2.901.
    [14] M. J. Reno, R. J. Broderick, and J. E. Quiroz, “PV Distribution Interconnection Study Analysis,” in 3rd European American Solar Deployment Conference, 2013.
    [15] A. Ellis, B. Karlson, and J. Williams, “Utility-Scale Photovoltaic Procedures and Interconnection Requirements,” California, Feb. 2012. [Online]. Available: http://www.ntis.gov/help/ordermethods.asp?loc=7-4-0#online.
    [16] PT. PLN (PERSERO), “Rencana Usaha Penyediaan Tenaga Listrik.” Minister of Energy and Mineral Resources of the Republic of Indonesia, Jakarta, 2017.
    [17] Menteri Energi dan Sumber Daya Mineral Republik Indonesia, “Aturan Jaringan Sistem Tenaga Listrik (Grid Code).” 2020.
    [18] U. Faruq, A. Ridho, M. Vrayulis, and E. Julio, “Analisa Aliran Daya pada Sistem Tenaga Listrik menggunakan ETAP 12.6,” Jurnal Sain, Energi, Teknologi & Industri), vol. 6, no. 1, pp. 16–22, 2021, doi: 10.31849/sainetin.v6i1.7031.
    [19] A. Arizaldi, S. Salahuddin, M. Muhammad, V. Jain, G. P. Pandey, and M. J. Watane, “Short Circuit Analysis on Distribution Network 20 kV Using Etap Software,” Journal of Renewable Energy, Electrical, and Computer Engineering, vol. 1, no. 2, p. 49, Sep. 2021, doi: 10.29103/jreece.v1i2.5232.
    [20] A. Majeed Ghadban and M. W. Abdulwahhab, “Short Circuit Analysis for Power System Networks,” in Second Engineering Scientific Conference, Iraq: Diyala Journal of Engineering Sciences, Dec. 2015, pp. 343–354.
    [21] J. C. Das, Power system analysis: short-circuit load flow and harmonics. Marcel Dekker, 2002.
    [22] V. Lackovic, “Introduction to Short Circuit Current Calculations.” Continuing Education and Development, Inc., New Jersey.
    [23] B. Pratim Dutta, P. Solanki, V. Shanker Vivek, and S. Mahley, “Short Circuit Rating Selection Criteria for Circuit Breaker in PV Plants.” 2021. [Online]. Available: www.sterlingandwilsonsolar.com
    [24] N. Kalloe, J. Bos, J. Rueda Torres, M. van der Meijden, and P. Palensky, “A Fundamental Study on the Transient Stability of Power Systems with High Shares of Solar PV Plants,” Electricity, vol. 1, no. 1, pp. 62–86, Nov. 2020, doi: 10.3390/electricity1010005.
    [25] “Cloud Chart.” https://www.weather.gov/key/cloudchart# (accessed Jun. 17, 2023).
    [26] F. Bañuelos-Ruedas, C. Ángeles Camacho, and S. Rios-Marcuello, “Methodologies Used in the Extrapolation of Wind Speed Data at Different Heights and Its Impact in the Wind Energy Resource Assessment in a Region,” in Wind Farm – Technical Regulations, Potential Estimation and Siting Assessment, Rijeka, Croatia: InTech, 2011. [Online]. Available: www.intechopen.com

Levin Halim (2023), Interconnection Study in Utilizing of Solar Energy for 150 MW Photovoltaic Power Generation through 150 kV Transmission Line. IJEER 11(4), 956-965. DOI: 10.37391/ijeer.110412.